Translate

Showing posts with label Merwede kanaal. Show all posts
Showing posts with label Merwede kanaal. Show all posts

Thursday, 23 May 2013

Monday 20th May 2013 Meerkerk to Jutphaas. 16.4kms 2 locks



Windmill by Meerkerksebrug liftbridge.
Grey and drizzling when we set off at 10.15 am following Snail up to the Meerkersebrug liftbridge. The DB that had been moored alongside the Snail now had the mooring to itself. Lots of cruisers were coming past in the opposite direction and a loaded 55m barge called Spes-Nostra. Had a short wait at Zwannskuikenbrug and a cruiser, called Avontuur, that was also on the moorings at Meerkerk caught us up. We went through first, then a little cruiser that was waiting on the other side. Another short delay at Bolgerijensebrug swingbridge (still remotely operated). When the bridge opened we followed Avontuur through the right hand side and a whole armada of little boats came through the right hand side, heading in the opposite direction. As we went through Helsdingen, just before Vianen, we passed two loaded commercials, Amice and Veere, who were heading towards Gorichem. 
Bolgerijensebrug swingbridge
Paused in Vianen on the end of the moorings in the old arm to fill up our water tanks. Snail had the landing staging, we went alongside and Oll got his hosepipe out. Anne was still washing so we filled up first. A man came along with four small containers and Oll let him fill up. A cruiser came and tied alongside us waiting for the tap. I made sandwiches for lunch while we waited for the Snail to fill up. Set off again at 12.50 pm and turned at the end of the arm into the lock approach and followed one small cruiser into the waiting area for the Grote sluis. 
Useless bollard Grote sluis Vianen
There were five large empty commercials moored before the lock (on holiday?). A German cruiser was also in the waiting area for the lock. We went under the Julianabrug (with mast down), tied on the left bank and found that where they’d added safety fences at the bottom of the concrete steps leading the canal edge they’d added the fence right next to a bollard, so close that it made the bollard unusable. The lock emptied and we went in with the two cruisers and the lock filled, rising 20cms to river level. One of the cruisers turned left and went behind the waiting area steigers for boats wanting to use the lock and moored next to Avontuur. The Lek crossing was calm, two large boats had just gone past heading upriver, we turned left heading downriver and almost immediately turned right into the approach for the Koningennen sluis back on the Merwede kanaal. We waited in the lower chamber of what used to be a staircase, hanging on a suspended rope along the wall while five small cruisers came up the lock. The young lock keeper came down on the lockside to chat as he’d never seen a narrowboat before. 
As we went through Nieuwegein Mum was enthralled with the line of houseboats on the right hand side. On the left was a long line of big empty commercials. It started to pour down with rain as we continued up the Merwede kanaal. Turned sharp right an
Koningennen sluis
d found two liftbridges with double red lights. Expecting that to be the end of our day’s travels due to the working hours being shorter for the holiday, we moored on a quay at Jutphaas between lots of moored cruisers. No sooner had we tied our ropes to the bollards than the bridge lights changed to single reds and several cruisers came through! Decided we’d had enough, it was 3 pm and still pouring down.

Friday 17th May 2013 Arkel to Meerkerk. 7.65 kms no locks



Tug moving pontoon out of bridge hole to let us through
Grey and overcast, heavy rain set in after lunch. We set off at 9.15 am. Mike called on VHF to get the light changed from red to green on the flood lock leading from the R. Linge to the Verbindingskanaal, which would take us back on to the Merwede Kanaal. The lights changed and we passed through the big flood lock. We came to a stop behind a big cruiser called Spes, who was tied to the waiting area for the Schotdeurenbrug liftbridge as there was a piling gang with a big machine on a pontoon, in the bridge hole, fixing the anchoring bolts through the new piling. 

Railway swingbridge open
Nothing for it but to moor behind the cruiser and wait. Snail came alongside. It was almost an hour before the tug - there was one at each end - pushed the pontoon out of the bridge and allowed us through, plus the single cruiser that was waiting on the other side of the bridge. On to the Merwede kanaal and almost immediately came to another stop. The railway swingbridge was closed. The skipper on Spes said it would only be five minutes. No sooner had he said that than a little two-car unit crossed the bridge and the lights changed to red and green. 
Moored at Meerkerk
Green and on our way again, at last, back on a wide, deep (4m) canal again. Open fields and farmhouses on both sides and a line of trees along the right bank. Not long before there was no sign of the cruiser in front, he’d long gone when we reached Bazelbrug, the next liftbridge, which opened for us as we approached it, remotely operated. It was 11.30 am when we lashed to the bank in a gap among the cruisers at Meerkerk. We stayed at Meerkerk for a few days while Mike did a quick dash back to the UK to pick up his Mum so she could have a holiday on the boat with us.